HCP Overview
22 Dec 25 – 05 Jan 26
Public Cloud
Integration
Rollout Outcomes
7/10 Succeeded
Succeeded: 7/10 (70%)
Failed: 1/10 (10%)
E2E Failed: 2/10 (20%)
E2E Test Success Rate
56% | Sippy Results
56% (10/18) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 9h
Avg. Bump Duration
1h 52m
Latest Rollout Finished
106d 10h ago
2026-01-03T05:14:13Z 03 Jan 26 05:14 UTC
Latest Rollout Status
Succeeded
Staging
Rollout Outcomes
1/1 Succeeded
Succeeded: 1/1 (100%)
E2E Test Success Rate
93% | Sippy Results
93% (14/15) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
14d
Avg. Bump Duration
-
Latest Rollout Finished
117d 14h ago
2025-12-23T00:50:19Z 23 Dec 25 00:50 UTC
Latest Rollout Status
Succeeded
Production
Rollout Outcomes
1/1 Succeeded
Succeeded: 1/1 (100%)
E2E Test Success Rate
92% | Sippy Results
92% (23/25) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
14d
Avg. Bump Duration
11h 43m
Latest Rollout Finished
114d 21h ago
2025-12-25T17:24:14Z 25 Dec 25 17:24 UTC
Latest Rollout Status
Succeeded