HCP Overview
05 Jan 26 – 19 Jan 26
Public Cloud
Integration
Rollout Outcomes
26/48 Succeeded
Succeeded: 26/48 (54%)
Failed: 15/48 (31%)
E2E Failed: 7/48 (15%)
E2E Test Success Rate
78% | Sippy Results
78% (28/36) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
7h
Avg. Bump Duration
2h 5m
Latest Rollout Finished
90d 17h ago
2026-01-18T21:51:42Z 18 Jan 26 21:51 UTC
Latest Rollout Status
Failed
Staging
Rollout Outcomes
5/14 Succeeded
Succeeded: 5/14 (36%)
Failed: 2/14 (14%)
E2E Failed: 7/14 (50%)
E2E Test Success Rate
41% | Sippy Results
41% (12/29) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d
Avg. Bump Duration
7h 10m
Latest Rollout Finished
90d 15h ago
2026-01-18T23:35:32Z 18 Jan 26 23:35 UTC
Latest Rollout Status
E2E Failed
Production
Rollout Outcomes
1/1 Succeeded
Succeeded: 1/1 (100%)
E2E Test Success Rate
85% | Sippy Results
85% (23/27) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
14d
Avg. Bump Duration
6h 59m
Latest Rollout Finished
94d 15h ago
2026-01-14T23:36:30Z 14 Jan 26 23:36 UTC
Latest Rollout Status
Succeeded