HCP Overview
24 Nov 25 – 08 Dec 25
Public Cloud
Integration
Rollout Outcomes
26/92 Succeeded
Succeeded: 26/92 (28%)
Failed: 53/92 (58%)
E2E Failed: 13/92 (14%)
E2E Test Success Rate
56% | Sippy Results
56% (35/63) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
3h 39m
Avg. Bump Duration
1h 31m
Latest Rollout Finished
134d 10h ago
2025-12-06T05:28:57Z 06 Dec 25 05:28 UTC
Latest Rollout Status
Succeeded
Staging
Rollout Outcomes
2/19 Succeeded
Succeeded: 2/19 (11%)
Failed: 10/19 (53%)
E2E Failed: 3/19 (16%)
Canceled: 4/19 (21%)
E2E Test Success Rate
Avg. Time Between
17h 41m
Avg. Bump Duration
2h 56m
Latest Rollout Finished
134d 15h ago
2025-12-06T00:02:34Z 06 Dec 25 00:02 UTC
Latest Rollout Status
Succeeded E2E Failed