HCP Overview
19 Jan 26 – 02 Feb 26
Public Cloud
Integration
Rollout Outcomes
13/63 Succeeded
Succeeded: 13/63 (21%)
Failed: 41/63 (65%)
E2E Failed: 9/63 (14%)
E2E Test Success Rate
59% | Sippy Results
59% (13/22) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
5h 20m
Avg. Bump Duration
2h 30m
Latest Rollout Finished
76d 17h ago
2026-02-01T20:41:56Z 01 Feb 26 20:41 UTC
Latest Rollout Status
E2E Failed
Staging
Rollout Outcomes
3/13 Succeeded
Succeeded: 3/13 (23%)
Failed: 5/13 (38%)
E2E Failed: 5/13 (38%)
E2E Test Success Rate
38% | Sippy Results
38% (9/24) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 1h
Avg. Bump Duration
3h 49m
Latest Rollout Finished
78d 18h ago
2026-01-30T20:00:08Z 30 Jan 26 20:00 UTC
Latest Rollout Status
Succeeded
Production
Rollout Outcomes
3/6 Succeeded
Succeeded: 3/6 (50%)
Failed: 2/6 (33%)
Canceled: 1/6 (17%)
E2E Test Success Rate
59% | Sippy Results
59% (48/82) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
2d 8h
Avg. Bump Duration
20h 23m
Latest Rollout Finished
76d ago
2026-02-02T13:34:21Z 02 Feb 26 13:34 UTC
Latest Rollout Status
Succeeded