HCP Overview
13 Apr 26 – 19 Apr 26
Public Cloud
Integration
Rollout Outcomes
20/50 Succeeded
Succeeded: 20/50 (40%)
Failed: 22/50 (44%)
E2E Failed: 8/50 (16%)
E2E Test Success Rate
63% | Sippy Results
63% (22/35) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
3h 5m
Avg. Bump Duration
2h 58m
Latest Rollout Finished
3h 18m ago
2026-04-19T07:20:30Z 19 Apr 26 07:20 UTC
Latest Rollout Status
E2E Failed
Staging
Rollout Outcomes
5/6 Succeeded
Succeeded: 5/6 (83%)
Failed: 1/6 (17%)
E2E Test Success Rate
47% | Sippy Results
47% (8/17) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 1h
Avg. Bump Duration
7h 36m
Latest Rollout Finished
1d 17h ago
2026-04-17T17:15:19Z 17 Apr 26 17:15 UTC
Latest Rollout Status
Succeeded
Production
Rollout Outcomes
2/4 Succeeded
Succeeded: 2/4 (50%)
Canceled: 2/4 (50%)
E2E Test Success Rate
49% | Sippy Results
49% (17/35) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 14h
Avg. Bump Duration
1d 12h
Latest Rollout Finished
1d 12h ago
2026-04-17T22:19:04Z 17 Apr 26 22:19 UTC
Latest Rollout Status
Succeeded