HCP Overview
08 Dec 25 – 22 Dec 25
Public Cloud
Integration
Rollout Outcomes
15/29 Succeeded
Succeeded: 15/29 (52%)
Failed: 9/29 (31%)
E2E Failed: 5/29 (17%)
E2E Test Success Rate
69% | Sippy Results
69% (20/29) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
11h 35m
Avg. Bump Duration
58m 9s
Latest Rollout Finished
119d 12h ago
2025-12-21T03:32:15Z 21 Dec 25 03:32 UTC
Latest Rollout Status
E2E Failed
Staging
Rollout Outcomes
4/5 Succeeded
Succeeded: 4/5 (80%)
Failed: 1/5 (20%)
E2E Test Success Rate
67% | Sippy Results
67% (12/18) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
2d 19h
Avg. Bump Duration
5h 18m
Latest Rollout Finished
120d 22h ago
2025-12-19T18:09:48Z 19 Dec 25 18:09 UTC
Latest Rollout Status
Succeeded
Production
Rollout Outcomes
1/5 Succeeded
Succeeded: 1/5 (20%)
Failed: 1/5 (20%)
E2E Failed: 2/5 (40%)
Canceled: 1/5 (20%)
E2E Test Success Rate
56% | Sippy Results
56% (30/54) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
2d 19h
Avg. Bump Duration
7h 30m
Latest Rollout Finished
114d 3h ago
2025-12-26T12:35:31Z 26 Dec 25 12:35 UTC
Latest Rollout Status
Failed