HCP Overview
16 Feb 26 – 02 Mar 26
Public Cloud
Integration
Rollout Outcomes
35/98 Succeeded
Succeeded: 35/98 (36%)
Failed: 34/98 (35%)
E2E Failed: 29/98 (30%)
E2E Test Success Rate
53% | Sippy Results
53% (36/68) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
3h 25m
Avg. Bump Duration
1h 11m
Latest Rollout Finished
49d 6h ago
2026-03-01T06:24:24Z 01 Mar 26 06:24 UTC
Latest Rollout Status
E2E Failed
Staging
Rollout Outcomes
3/13 Succeeded
Succeeded: 3/13 (23%)
Failed: 9/13 (69%)
E2E Failed: 1/13 (8%)
E2E Test Success Rate
94% | Sippy Results
94% (17/18) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 1h
Avg. Bump Duration
8h 36m
Latest Rollout Finished
48d 22h ago
2026-03-01T14:38:22Z 01 Mar 26 14:38 UTC
Latest Rollout Status
Failed
Production
Rollout Outcomes
0/3 Succeeded
Failed: 1/3 (33%)
E2E Failed: 1/3 (33%)
Canceled: 1/3 (33%)
E2E Test Success Rate
54% | Sippy Results
54% (14/26) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
4d 16h
Avg. Bump Duration
1h 29m
Latest Rollout Finished
50d 22h ago
2026-02-27T15:01:57Z 27 Feb 26 15:01 UTC
Latest Rollout Status
Canceled