HCP Overview
02 Mar 26 – 16 Mar 26
Public Cloud
Integration
Rollout Outcomes
27/85 Succeeded
Succeeded: 27/85 (32%)
Failed: 13/85 (15%)
E2E Failed: 44/85 (52%)
Canceled: 1/85 (1%)
E2E Test Success Rate
38% | Sippy Results
38% (29/77) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
3h 57m
Avg. Bump Duration
1h 43m
Latest Rollout Finished
34d 15h ago
2026-03-15T21:12:54Z 15 Mar 26 21:12 UTC
Latest Rollout Status
E2E Failed
Staging
Rollout Outcomes
6/16 Succeeded
Succeeded: 6/16 (38%)
E2E Failed: 9/16 (56%)
Canceled: 1/16 (6%)
E2E Test Success Rate
53% | Sippy Results
53% (19/36) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
21h
Avg. Bump Duration
3h 4m
Latest Rollout Finished
35d 23h ago
2026-03-14T13:47:43Z 14 Mar 26 13:47 UTC
Latest Rollout Status
Succeeded
Production
Rollout Outcomes
5/13 Succeeded
Succeeded: 5/13 (38%)
E2E Failed: 1/13 (8%)
Canceled: 7/13 (54%)
E2E Test Success Rate
59% | Sippy Results
59% (38/64) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 1h
Avg. Bump Duration
22h
Latest Rollout Finished
34d 5h ago
2026-03-16T07:12:30Z 16 Mar 26 07:12 UTC
Latest Rollout Status
Succeeded E2E Failed