HCP Overview
16 Mar 26 – 30 Mar 26
Public Cloud
Integration
Rollout Outcomes
38/94 Succeeded
Succeeded: 38/94 (40%)
Failed: 14/94 (15%)
E2E Failed: 42/94 (45%)
E2E Test Success Rate
47% | Sippy Results
47% (41/87) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
3h 34m
Avg. Bump Duration
1h 21m
Latest Rollout Finished
20d 11h ago
2026-03-30T00:14:25Z 30 Mar 26 00:14 UTC
Latest Rollout Status
Succeeded
Staging
Rollout Outcomes
12/21 Succeeded
Succeeded: 12/21 (57%)
Failed: 4/21 (19%)
E2E Failed: 5/21 (24%)
E2E Test Success Rate
61% | Sippy Results
61% (22/36) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
16h
Avg. Bump Duration
1h 27m
Latest Rollout Finished
20d 16h ago
2026-03-29T19:20:10Z 29 Mar 26 19:20 UTC
Latest Rollout Status
Succeeded
Production
Rollout Outcomes
3/13 Succeeded
Succeeded: 3/13 (23%)
E2E Failed: 5/13 (38%)
Canceled: 5/13 (38%)
E2E Test Success Rate
51% | Sippy Results
51% (42/82) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 1h
Avg. Bump Duration
1d 1h
Latest Rollout Finished
20d 4h ago
2026-03-30T07:54:49Z 30 Mar 26 07:54 UTC
Latest Rollout Status
Succeeded E2E Failed