HCP Overview
30 Mar 26 – 13 Apr 26
Public Cloud
Integration
Rollout Outcomes
37/89 Succeeded
Succeeded: 37/89 (42%)
Failed: 29/89 (33%)
E2E Failed: 23/89 (26%)
E2E Test Success Rate
61% | Sippy Results
61% (37/61) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
3h 46m
Avg. Bump Duration
1h 25m
Latest Rollout Finished
6d 13h ago
2026-04-12T22:45:23Z 12 Apr 26 22:45 UTC
Latest Rollout Status
Failed
Staging
Rollout Outcomes
9/18 Succeeded
Succeeded: 9/18 (50%)
E2E Failed: 9/18 (50%)
E2E Test Success Rate
41% | Sippy Results
41% (13/32) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
18h 40m
Avg. Bump Duration
7h 44m
Latest Rollout Finished
7d 12h ago
2026-04-11T23:00:40Z 11 Apr 26 23:00 UTC
Latest Rollout Status
Succeeded
Production
Rollout Outcomes
0/8 Succeeded
E2E Failed: 2/8 (25%)
Canceled: 6/8 (75%)
E2E Test Success Rate
28% | Sippy Results
28% (21/75) of all prow jobs run during this time period passed, including reruns.
Avg. Time Between
1d 18h
Avg. Bump Duration
7h 18m
Latest Rollout Finished
2d 19h ago
2026-04-16T16:10:52Z 16 Apr 26 16:10 UTC
Latest Rollout Status
Succeeded E2E Failed