Environment Overview
Deployment Taking Too Long
1 image has exceeded the 10d SLO for deployment duration. View details
Avg Time Between Rollouts
2d 5h
Rollout Outcomes
Succeeded: 1/6 (17%)
E2E Failed: 2/6 (33%)
Canceled: 3/6 (50%)
Succeeded 1/6 (17%)
E2E Failed 2/6 (33%)
Canceled 3/6 (50%)